A. Sutton
Pipelines Ltd has undertaken from construction phase a number of pipeline schemes with
diameters ranging from 80mm to 600mm, materials used vary from PE, DI, PVCu & PCC
to name but a few. ASPL has never had a pressure test
failure on any pipe work laid or welded and installed by our fully
competent workforce. All our pipe work passes pressure tests first time. ASPL can
also offer a full design/build and commission service. As
well as the completions above we also undertake reactive
sewer repairs for Severn Trent Water, this contract has been
with ASPL for the last 2 years.
 |
The installation of this 16bar
450mm PE SDR 11 PE pipe work was laid for North Midlands
Construction on behalf of Severn Trent Water's AMP4 rising
main upgrade programme. The 450mm was laid in some locations
directly on top of the 15" CI existing due to the proximity
of other utilities. The existing pumping main was
structurally unsound so laying on top of the existing route
was "high risk", this method statement and associated risk
assessment's were briefed to each worker on site and
feedback from the men was considered. The total scheme was
approx 750m. The programme of works was set by NMC and the
ASPL men finished the asset, pressure tested and
commissioned the new pipe 3 weeks ahead of schedule and 20%
under budget. This
allowed STW to remove the asset from its "at risk" register
over the Christmas period. |
|
 |
Groundworks and reinstatements
are part of ASPL's regular daily activities. We have
undertaken and supplied labour for many reinstatement
schemes such as Blenheim Business Park, Notttingham. The
Kings Mill Hospital Project, Mansfield. Numerous car parks
and driveways. ASPL has recently tendered a scheme from the UK
Sports Council to reform and resite and BMX track in
Woodhouse, Nottinghamshire. As well as individual
schemes ASPL have contracts with Severn Trent Water to
repair and maintain street furniture on AMP4 coded works.
|
|
 |
Installation of sewers
(private & public) is a regular undertaking of ASPL. Contact
us for a quote. We have fully qualified men working on this
type of activity daily and scored maximum points on our
KPI's for our main Client,
North Midlands Construction. |
 |
Pipework laid at a sewerage
treatment plant near Burton on Trent. Skilled men supplied
to Norwest Holst to carry out the installation, associated
connections and pressure testing of 2x 500m of 180mm DI
Stantyte pipeline. Also lay 2x 250m of 225 PE fully welded
system and pressure test. Install 40m of 600 DI pipe to
engineers levels. All men supplied were CSCS trained in L2
NVQ's. ASPL is aware of the need for fully qualified
experienced men working on specific pipeline materials.
|
 |
To traffic manage, quantify
fittings from approved designs and provide 2 x pipebursting
teams, 2 x open cut teams and 4 x T/H teams to work on the
Enterprise Plc / Three Valleys Water pipeline rehabilitation
programme. ASPL laid 3200m of 100 PE pipe through some of
the busiest streets in Wembley, North London. |
|